What is 'ramp heating'?
Ramp heating involves embedded electrical cables or fluid pipes within the car park ramp structure that heat up to prevent ice and snow accumulation. When resurfacing or repairing ramps, care must be taken not to damage these elements. We often install protective resin toppings that are compatible with heated ramps, conducting heat efficiently while protecting the concrete from salt and water ingress.
The two systems. Electric ramp heating uses resistance heating cables or mats laid in the screed or topping, typically 30-50mm below the running surface, rated at around 300 W/m² for a trafficked ramp, and switched by a controller that reads a combined temperature and moisture sensor set flush in the surface so the cables only run when it is both cold and wet. Hydronic (wet) systems circulate a water-glycol mix from a boiler, heat pump or waste-heat source through plastic pipes laid at close centres in the slab or screed; they cost more to install, cost less to run on a large ramp, and are the usual choice on new multi-storey car parks with a plant room nearby. Both are there for one reason: a 1-in-10 car park ramp that ices over is closed, and a closed ramp closes every level above it.
What goes wrong. Heating elements fail far more often from damage than from age. Cables are cut by coring, saw-cutting new joints, drilling for signs and barriers, or planing and scabbling during resurfacing; a nicked sheath lets water into the conductor and the circuit trips its RCD every time it rains; cold-tail joints and junction boxes corrode; and surface sensors fail or are resurfaced over. On the concrete side, salt-laden water that the heating keeps liquid is exactly what drives chloride corrosion of the reinforcement, so heated ramps spall and delaminate sooner than unheated decks if the surfacing over them is not kept sound.
How repairs under a heated ramp are carried out. The first job is to find the elements before anything is broken out: the as-built drawings if they exist, then a thermal-imaging camera with the system energised, which shows the cable or pipe runs as warm lines through the surface, or a cable tracer on an electric system. The heated zone is marked up and all breakout within it is done by hand with small tools rather than by breaker or planer, working down to the cover over the elements and no further. On an electric system an insulation-resistance test is taken before work starts and repeated when it finishes, so any damage is found while the surface is still open; a damaged section is repaired by a competent electrician with a manufacturer's splice kit or replaced, to BS 7671. Spalled or delaminated concrete is reinstated with a repair mortar to BS EN 1504-3 and the surface is re-laid with a thin, fully bonded resin system — usually 2-4mm of PMMA or polyurethane with an anti-skid broadcast — chosen so that it adds as little insulating thickness over the elements as possible and does not trap moisture against the cables. A thick insulating screed or an unbonded overlay defeats the heating and is the commonest mistake on a resurfaced heated ramp.
MPS carries out the concrete repair and resurfacing on heated ramps and coordinates the electrical or hydronic work with the system installer; we do not install the heating elements themselves. If you are planning any resurfacing or joint work on a ramp and are not certain whether it is heated, assume it is until a scan says otherwise.
Reviewed by Jerry Blears, Director (LinkedIn), MPS Concrete Solutions. Last reviewed October 2026.
Anti Skid Surfacing for Ramps
Heated ramps still need grip. Our anti-skid page covers how high-friction surfacing works, PSV and pendulum testing, and the thin-build resin systems that suit a heated ramp.