STERLING COURT
Podium Deck & Structural Repairs
Project Summary
Sterling Court, a residential development in North London, showed significant signs of concrete deterioration and water ingress across its podium deck and soffits. The issues threatened both the structure's long-term integrity and the condition of occupied areas below, requiring a targeted remediation programme.
The MPS Solution
MPS Concrete Solutions carried out a full schedule of remedial works, including breaking out defective concrete, re-levelling surfaces, and applying a durable waterproofing system. The repairs were executed with precision to restore strength and functionality while ensuring minimal disruption to residents. A key focus was reinstating the podium to full service while reducing ongoing maintenance risks.
Project Details
Project
Podium Deck Repairs & Waterproofing
Client
Residential Block Management
Focus
Structural Concrete Repairs
Location
Sterling Court, North London
Year Built
2023
Related Resources
Services and guides relevant to this project
Industrial Concrete Repairs
Structural remediation, surface reinstatement and waterproofing for podium decks, soffits and residential structures across the UK.
Learn more → Pricing GuideConcrete Repair Cost Guide
Indicative UK pricing for patch repairs, structural waterproofing and podium deck remediation. A proper site survey is always required.
View guide →Need Similar Work?
Contact our expert team for a consultation